Monitor Series 4 Service Instructions

Series 4: Monitor Housing Replacement

Step 1.  Remove the tie rods and JCB bolts connecting the top deck to the tank assembly as shown.

Step 2– Remove the top deck assemble as shown, being careful not to dislodge the guide pulleys.

Step 3– Disconnect the Sensor Connector. Remove the old monitor retaining pin and remove the old monitor from the key bracket as shown.

Step 4– Position the S4 monitor assembly through the right key bracket as shown. Ensure that the spring and washer orientation is correct. The washer should be placed after the spring is in place on the tube. Replace the R pin retaining the monitor assembly as shown. Reconnect the Sensor Connector.

Step 5– Replace the top deck as shown.
Step 6– Replace the JCB bolts and tie rods connecting the top deck to the tank assembly as shown. Ensure that the tie rod cross dowel slots are aligned with the tie rod. You may utilize a screw driver to assist this.

 

Related Articles

  • A1/GX: Seat Carriage Replacement

    Step 1.  Stand the Indo-Row machine up and undo the bungee cord. Step 2.  Using the 5mm Allen Key, undo the 2 back rear leg bolts. Step 3.  Using the...

  • S1: Rail Extrusion Replacement

    Step 1.  With the 5mm Allen key, unscrew the seat stops. There are two on the front and back of each rail. Step 2.  Peel the old extrusion off the...

  • A1/GX: Sensor Replacement

    Step 1.  Remove the handle from the handle rests and place the handle in the full position as shown. Step 2.  Remove the top 2 tie rods and JCB bolts...

  • Series 3: Footboard Replacement

    Step 1-Remove the Handle from the handle rests and place the handle in the full forward position.   Step 2– Remove the handle rest bolts and handle rests as shown....