Series 2 Service Instructions

Series 2: Double Bungee Replacement

Step 1.  Remove the Handle from the handle rests and place the handle in the full forward position.

Step 2.  Stand the WaterRower upright and disconnect the bungee from the recoil belt as shown.

Step 3.  Remove the Bungee from the rear spacer and reattach the replacement bungee as shown.
Step 4.  Reconnect the Bungee to the recoil belt as shown.If the recoil belt buckle has been removed reattach it as shown, if not go to step 5.
Step 5.  Use one hand to take the tension of the bungee and the other to support the recoil belt, feed the recoil belt through the D-ring.

Step 6.  Pass the recoil belt through back through the recoil belt buckle as shown.

Related Articles

  • Series 3: Tacho Pulley Replacement

    Step 1 – Remove the Handle from the handle rests and place the handle in the full forward position as shown. Step 2 – Stand the WaterRower upright and disconnect the bungee...

  • Series 4: Cover Plate Replacement (push-button)

    Step 1– Press the Heel Rest adjustment button and remove the Heel Rests as shown. Step 2– Using the 5mm Allen Key provided with the machine, remove the Heel Rest...

  • A1/GX: Rear Leg Replacement

    The rear leg of the A1/GX WaterRower helps to support the monorail. To order this part, visit our website: WRPK1500 – GX/A1 Rear Leg Assembly

  • A1/GX: Short Tank Assembly Replacement

    Step 1. Remove the handle from the handle rests and place in the full forward position. Step 2. Stand the WaterRower upright and disconnect the bungee. Step 3. Lay the WaterRower down...